Too many times we see the turbine valves seats not being restored or maintained properly. We at T & W Valve have developed a method to restore your turbine valves seats in less than 7 days, typically, with a guaranteed 100% blue.
We bring a mobile machine shop to ensure an accurate seat restore tool, as every seat is different; with this mobile machine shop we can also support all other turbine machining and welding needs, working alongside the turbine general.
In addition, we have assembled a team that can replace a damaged seat to include: machining, welding, NDT and heat treating. We can also weld, machine and restore your integral seats ( GE, IC valves, and GV ).
Our services, delivered through our Owensboro, Kentucky Repair Center, as well as through plant-site operations, are all staffed by fully qualified, highly proficient technicians and engineers.